Available Material ( Raw Materials) | Surface Treatment (Surface Treatment) |
Aluminum Alloy of ADC12, A380, A360, Etc. Zinc Alloy of Zinc#3, Zinc#5, Zinc#8, Etc. |
Powder Coating with Different Colors Sand Blasting, Shot Blasting, Etc. |
Production Process | Quality Control |
Mold: DFM Discussion, Materials Purchase, Wire Cut, EDM, Heat Treatment, Etc. Die Casting Parts: Die Casting, Deburring, Polishing, Grinding, Sand Blasting, Powder Coating, CNC Machining, Lathing, Etc. |
Advanced Inspection Equipment (CMM, 3D Coordinate Measuring Machine), 2.5D Projector, etc. |
Lead Time & Packing | Application |
30~55 Days for molds 12-18 Days for samples 25-35 Days for mass production |
Gas Industry, New Industry, Medical Industry, Printing & Copying Industry, Communication Network, Auto Parts, Security Industry, Etc. |
5~7 Days via Express: DHL, FedEx, UPS, Etc. | Monitoring System, Bank System and Power System |
Standard Exporting Package / Pallet or Container / Accoridng to Customized Specifications | Industrial Metal Spare Parts, Etc. |